TJCAIA News Blog

Project Update

On The Boards

  • A green design concept was developed for Calvary High School in Monterey , CA
  • Schematic design drawings and models have been approved for The Village at Soledad (a retail center) by the city’s planning commission.
  • Construction drawings are complete for a home addition in Moss Landing, CA.
  • Construction drawings have been completed for renovations to the historic Wall Street Inn, Watsonville, CA.

Processing Permits

  • A conditional use permit for a new 26,000 sq. ft. office building near the Salinas Airport has been approved by the City’s Department of Community Development.
  • Construction drawings are being processed for a
    building permit for a two-story education building for Liberty Chapel
    in Soledad, CA.
  • Construction drawings are being processed for an extensive remodel of a home in Toro Park near Salinas, CA.
  • Another building permit has been granted for a home addition in Salinas, CA.
  • Construction drawings have been approved by the
    Monterey County Planning and Building Department for a 4,000 sq. ft.
    home on Lot 18 (10 acres) in Hidden Canyon Ranch.

Under Construction

  • The first phase of construction of seventy-three new bungalows has started in Spreckels, CA. The homebuilder is the Northern California Division of Standard Pacific Homes.
    Tom Carleton has worked with SP as a design consultant to match the new
    homes to the Craftsman style of existing homes in this historic town.
    Six models will vary from a one-story 1,300 sq. ft. plan to a two-story
    2,870 sq. ft. plan.
  • A new office building near Ryan Ranch in Monterey, CA, is almost completed with ¾ of the tenant space leased already. John Jessen is the owner-builder.
  • The conversion of an historic residence into offices for Yuki Farms on Rt. 68 near Salinas, is about 95% complete. Exterior painting and interior woodwork is finished. Don Desmond is the general contractor.
  • A two-story addition to the Bolosan residence in south Salinas is progressing. Baggett Construction is the general contractor.
  • Construction has started for a new 4,000 sq. ft. home including a guesthouse on Lot 9 (5 acres) in Hidden Canyon Ranch in Prundedale, CA. Scheel Construction is the builder.
  • A new “caretaker unit” and renovations for an existing home on the same site in Prunedale, CA, are underway by Gourley Construction.
  • The final phases of construction are progressing for a new custom home in Halycon Heights in Monterey, CA. Steelhead Construction is the framer.

Recently Built

  • A new custom home of 3,400 sq. ft. in Pebble Beach, CA, is complete. E. C. & Son was the general contractor. Go to Alain Pinel Realty.
  • The Boronda Square Shopping Center, in southeast Salinas, is finished and is 95% leased. Kent Construction is the general contractor.
  • A makeover of the Allen residence in the Maple Park neighborhood of Salinas is finished. Baggett Construction was the general contractor.
  • Office renovations are complete for the Rossi Street branch and the Hollister branch of the Pacific Valley Bank in Salinas, CA.
  • Construction is complete for a residential makeover in Morgan Hill, CA. Robert Deal was the general contractor.

Comments are closed.